Avci B, Girotra K, Netessine S (2015) Electric vehicles with a battery switching station: Adoption and environmental impact. Manag Sci 61(4):772–794
Barlow R, Hunter L (1960) Optimum preventive maintenance policies. Oper Res 8(1):90–100
Basten RJI, Van Houtum GJ (2014) System-oriented inventory models for spare parts. Surv Oper Res Manag Sci 19(1):34–55
Basten RJI, Van der Heijden MC, Schutten JMJ, Kutanoglu E (2015) An approximate approach for the joint problem of level of repair analysis and spare parts stocking. Ann Oper Res 224(1):121– 145
Behfard S, Van der Heijden MC, Al Hanbali A, Zijm WHM (2015) Last time buy and repair decisions for spare parts. Eur J Oper Res 244(2):498–510
Bian L, Gebraeel N, Kharoufeh JaiIT (2015) Degradation modeling for real-time estimation of residual lifetimes in dynamic environments. IIE Trans 47(5):471–486
Candas MF, Kutanoglu E (2007) Benefits of considering inventory in service parts logistics network design problems with time-based service constraints. IIE Trans 39(2):159–176
Cohen MA, Agrawal N, Agrawal V (2006) Winning in the aftermarket. Harv Bus Rev 84(5):129–138
Croston J (1972) Forecasting and stock control for intermittent demands. Operation 23(3):289–303
Deshpande V, Iyer AV, Cho R (2006) Efficient supply chain management at the U.S. Coast Guard using part-age dependent supply replenishment policies. Oper Res 54(6):1028–1040
Ebeling C (2001) Introduction to reliability and maintainablity engineering, 2nd edn. McGraw-Hill
ESCF (2012) Spare parts planning at ASMl. ESCF operations practices. http://www.escf.nl/operation
Harrington L (2007) From just in case to just in time. Air transport world. pp 77–80
Hausman W, Scudder G (1982) Priority scheduling rules for repairable inventory systems. Manag Sci 28(11):1215–1232
Ichoua S, Gendreau M, Potvin JY (2006) Exploiting knowledge about future demands for real-time vehicle dispatching. Transp Sci 40(2):211–225
International Organization for Standardization (2008) Systems and software engineering–system life cycle processes. ISO/IEC/IEEE 15288:2015
Jardine AKS, Tsang AHC (2006) Maintenance, replacement, and reliability. Theory and applications, Dekker Mechanical Engineering, CRC Press, Boca Raton, FL,
Jardine AKS, Lin D, Banjevic D (2006) A review on machinery diagnostics and prognostics implementing condition-based maintenance. Mech Syst Signal Process 20:1483–1510
De Jonge B, Klingenberg W, Teunter RH, Tinga T (2016) Reducing costs by clustering maintenance activities for multiple critical units. Reliab Eng Syst Saf 145:93–103
Knofius N, Van der Heijden M, Zijm W (2016) Selecting parts for additive manufacturing in service logistic. J Manuf Technol Manag 27:915–931
Koenigsberg E (1982) Twenty five years of cyclic queues and closed queue networks: A review. J Oper Res Soc 33(7):605–619
Kranenburg B (2006) Spare parts inventory control under system availability constraints. PhD thesis, Eindhoven University of Technology
Lolli F, Gamberini R, Regattieri A, Balugani E, Gatos T, Gucci S (2017) Single-hidden layer neural networks forecasting intermittent demand. Int J Prod Econ 183:116–128
Martinetti A, Braaksma AJJ, Ziggers J, Van Dongen LAM (2017) On the initial spare parts assortment for capital assets: a structured approach aiding initial spare parts assortment decisionmaking. In: Redding L, Roy R, Shaw A (eds) Advances in through-life engineering services. Springer, New York, pp 429–442
Maxwell MS, Restrepo M, Henderson SG, Topaloglu H (2010) Approximate dynamic programming for ambulance redeployment. INFORMS J Comput 22(2):266–281
Moon S (2013) Predicting the performance of forecasting strategies for naval spare parts demand–a machine learning approach. Manag Sci Financ Eng 19(1):1–10
Muckstadt JA (1973) A model for a multi-item, multi-echelon, multi-indenture inventory system. Manag Sci 20(4):472–481
Muckstadt JA (2005) Analysis and algorithms for service parts supply chains. Springer, New York
Nicolai RP, Dekker R (2008) Optimal maintenance of multi-component systems: A review. In: Murthy DNP (ed) Kobbacy KAH. Complex system maintenance handbook, Springer Series in Reliability Engineering, Springer, London (UK), pp 263–286
Olde Keizer MCA, Teunter RH, Veldman J (2016) Clustering condition-based maintenance for systems with redundancy and economic dependencies. Eur J Oper Res 251:531–540
Olde Keizer MCA, Flapper SDP, Teunter RH (2017) Condition-based maintenance policies for systems with multiple dependent components: a review. Eur J Oper Res 261(1):405–420
Oliva R, Kallenberg R (2003) Managing the transitions from products to services. Int J Serv Ind Manag 14:160–172
Pai P, Lin K (2006) Application of hybrid learning neural fuzzy systems in reliability prediction. Qual Reliab Eng Int 22(2):199–211
Peng Y, Dong M, Zuo MJ (2010) Current status of machine prognostics in condition-based maintenance: a review. Int J Adv Manuf Technol 50:297–313
Pintelon L, Van Puyvelde F (2006) Maintenance decision making. Acco, Leuven (Belgium)
Pourakbar M, Frenk JGB, Dekker R (2012) End-of-life inventory decisions for consumer electronics service parts. Prod Oper Manag 21(5):889–906
Prajapati A, Bechtel J, Ganesan S (2012) Condition based maintenance: a survey. J Qual Maint Eng 18(4):384–400
Rahimi-Ghahroodi S, Al Hanbali A, Zijm WHM, Van Ommeren JKW, Sleptchenko A (2017) Integrated planning of spare parts and service engineers with partial backlogging. OR Spectr 39(3):711–748
Rappold JA, Van Roo BD (2009) Designing multi-echelon service parts networks with finite repair capacity. Eur J Oper Res 199(3):781–792
Romeijnders W, Teunter R, Van Jaarsveld W (2012) A two-step method for forecasting spare parts demand using information on component repairs. Eur J Oper Res 220(2):386–393
Sherbrooke C (2004) Optimal inventory modeling of systems: multi-echelon techniques. Kluwer Academic, Boston/Dordtrecht/London
Sherbrooke CC (1968) Metric: a multi-echelon technique for recoverable item control. Oper Res 16(1):122–141
Song JS, Zhang Y (2017) Stock or print? impact of 3d printing on spare parts logistics. Working Paper
Swartz E (2014) The transformation of ge: From "we bring good things to life" to industrial machines in the cloud. Blog. http://www.metratech.com/blog/industrial-machines-in-the-cloud/. Accessed 7 May 2017
Syntetos AA, Boylan JE (2005) The accuracy of intermittent demand estimates. Int J Forecast 21(2):303–314
Taylor J, Jackson RRP (1954) An application ofthe the birth death process to the provision of spare machines. Oper Res Q 5(4):95–108
Teunter R, Syntetos A, Babai M (2011) Intermittent demand: linking forecasting to inventory obsolescence. Eur J Oper Res 214(3):606–615
Topan E, Tan T, Van Houtum G, Dekker R (2018) Using imperfect advance demand information in lost-sales inventory systems. IISE Trans
Van Houtum GJ, Kranenburg B (2015) Spare parts inventory control under system availability constraints. International Series in OR & MS, Springer, New York
Van Jaarsveld W, Dollevoet T, Dekker R (2015) Improving spare parts inventory control at a repair shop. Omega 57:217–229
Van Wingerden E, Tan T, Van Houtum G (2017) Spare parts inventory control under uncertain demand rates. Working Paper
Vliegen I (2009) Integrated planning for service tools and spare for capital goods. PhD thesis, Eindhoven University of Technology
Wang W, Syntetos A (2011) Spare parts demand: linking forecasting to equipment maintenance. Transp Res Part E: Logist Transp Rev 47(6):1194–1209
Westerweel B, Basten RJI, Van Houtum GJ (2018) Traditional or additive manufacturing? assessing component design options through lifecycle cost analysis. Eur J Oper Res 270(2):570–585
Zhu Q (2015) Maintenance optimization for multi-component systems under condition monitoring. PhD thesis, Eindhoven University of Technology